--- title: 'Engineer I, Equipment at LG Energy Solution Arizona' canonical: 'https://feeny.ai/job/engineer-i-equipment-lg-energy-solution-arizona-queen-creek-zhwrd16n8smk' type: 'job' last_seen: '2026-09-13' --- # Engineer I, Equipment at LG Energy Solution Arizona - **Company:** LG Energy Solution Arizona - **Location:** Queen Creek, AZ - **Posted:** 2026-09-02 - **Last confirmed live:** 2026-09-13 - **Apply:** https://job-boards.greenhouse.io/lgenergyaz/jobs/5409398008 ## Job description We awaken the world with energy. LG Energy Solution is the global leader in lithium-ion battery technology for electric vehicles and energy storage solutions.  Located in Queen Creek, Arizona, LG Energy Solution Arizona, Inc. is LG Group's first cylindrical battery manufacturer in North America, leading the widespread distribution of electric vehicles with the most advanced battery technology in the world. Join us as we inspire our talent with growth, challenge, action and collaboration to Empower Every Possibility! Job Summary: The Equipment Engineer I will support overall efficiency and productivity of the manufacturing process by supporting related equipment from program and design to installation, commissioning and production.  This role will manage equipment set-up schedules, contribute to preventive maintenance standards and work with other engineers and technicians to resolve abnormalities in equipment operation, including root cause analysis and identification, and corrective action implementation and validation. Responsibilities: - Collaborate with LGES partners and equipment vendors. - Equipment investment and schedule management. - Monitor Overall Equipment Effectiveness (OEE) and Line of Balance (LOB) after improvements are made. - Install/modify/analyze/repair/test new tools/machines/equipment and technology utilized in the winder, assembly, formation processes of battery manufacturing. - Collaborate with other teams to improve process quality and conduct equipment modification and improvement activities. - Manage plans for daily maintenance activities. - Complete daily documentation and audits of equipment performance. - Maintain cleanliness at worksite in accordance with 5S3R Standards. - Ensure work is completed in a safe manner and maintain a safe work environment. - Perform other duties as assigned Qualifications: - Minimum of 1 year in equipment engineering experience in a production/plant environment. - Bachelor’s or higher degree in engineering or related field required. - PLC (Programmable Logic Controller) experience * Preferred but not required. - Six Sigma certification * Preferred but not required. - DOE (Design of experiments) * Preferred but not required. - Must be able to properly and regularly utilize the following Personal Protective Equipment (PPE) for a period of up to 12 hours. - Must be able to perform the following over the course of up to 12 hours per day. Skills: - Microsoft Office Suite. - Data analysis. - CAD (Computer-aided design) and coding * Preferred but not required. Why should you work here? 1. Growth - You are a self-driven individual who seeks and captures the opportunities for growth we offer by acquiring and solving tasks. 2. Challenge - You reach beyond expectations and strive for innovative methods beyond the traditional. 3. Action - You are driven, take initiative, can execute decisions with agility and fulfill tasks to completion. 4. Collaboration - You are enthusiastic about teamwork while respecting the different backgrounds and experience of colleagues. ## EEO Statement LG Energy Solution Arizona, Inc. is an Equal Employment Opportunity Employer. Recruitment Fraud Alert Notice We have recently become aware of fraudulent recruiting activities in which individuals falsely claiming to represent LG Energy Solution Arizona, Inc. contact job seekers, advertise fictitious employment opportunities, request personal information, or seek payment in connection with an application or job offer. LG Energy Solution Arizona, Inc. will never request payment, fees, gift cards, banking transfers, or purchases from candidates at any stage of the recruitment process. We also do not request sensitive personal information, such as a Social Security number or date of birth, during the initial application or interview process. Certain information may be required only after a legitimate offer has been accepted and as part of the formal onboarding, payroll, background-screening, or employment-verification process. Authorized LG Energy Solution Arizona, Inc. representatives conducting recruiting business by email will use an official “@lgensol.com” email address. Candidates should be cautious of communications originating from personal email accounts or requests to communicate exclusively through platforms such as Gmail, Yahoo, Outlook/Live.com, WhatsApp, Telegram, Signal, Discord, or iMessage. If you receive a suspicious communication or believe someone is fraudulently representing LG Energy Solution Arizona, Inc., do not respond or provide personal information, send money, or click any links or attachments. We take recruitment fraud seriously and encourage all candidates to remain vigilant. Our goal is to help protect job seekers from fraudulent activity and identity theft. ## About LG Energy Solution Arizona ## Core Business - Primary industry: Advanced battery manufacturing / Chemical manufacturing - Target customers: Automakers (EV OEMs) and energy storage system (ESS) providers – B2B, enterprise - Mission or purpose: “We provide diverse energy solutions for a better world” – enabling the green energy transition through innovative battery technology and localized U.S. production [lgensol.com](https://www.lgensol.com/en/company/info-outline) ## Products & Services - **46-Series Cylindrical Batteries (EV)**: High-capacity cylindrical cells for electric vehicles, first mass production planned at Ochang, Korea, with Arizona facility replicating that capability for North American automakers [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/2592/) - **LFP Pouch-Type Batteries (ESS)**: Lithium iron phosphate batteries for energy storage systems, one of the first ESS-exclusive production facilities in the world, serving the fast-growing U.S. ESS market [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/2592/) ## Market Standing - **Valuation/Market Cap**: Not disclosed for Arizona entity; parent LG Energy Solution market cap approximately $35–40B (as of mid-2025) - **Key Metric**: Total investment of **$5.5 billion** in the Arizona complex; average annual production capacity of **53 GWh** (36 GWh cylindrical, 17 GWh ESS) [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/2592/) - **Notable Investors/Partners**: Parent company LG Energy Solution; joint ventures with General Motors, Honda, and Hyundai Motors Group; partnerships with Arizona Commerce Authority, Pinal County, and Central Arizona College for workforce training [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/3784/) - **Growth Signals**: Construction ~50% complete as of April 2025; sample production expected mid-2026, commercial production by end of 2026; workforce growing from 62 employees (+357.9% YoY) to planned 1,500+ by 2027 [linkedin.com](https://www.linkedin.com/company/lg-energy-solution-az) [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/3784/) ## Competitive Advantages - **First stand-alone cylindrical battery plant in the U.S.** – early mover in domestic 46-Series production for EV customers. - **IRA-compliant “Made in America” batteries** – positions LG Energy Solution to benefit from U.S. clean energy policies and automaker demand for local supply chains. - **Diverse product portfolio** – simultaneously producing cylindrical cells for EVs and LFP pouch cells for ESS, covering two high-growth markets from one complex. - **Parent company expertise** – leverages LG Energy Solution’s 20+ years of battery manufacturing experience and existing U.S. operations (Holland, Michigan facility) [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/3784/) ## Strategic Focus - **Completion and ramp-up**: Finalizing construction of both facilities (cylindrical plant late 2025, ESS plant 2026) and transitioning to sample/commercial production. - **Local workforce development**: Investing in training programs through the Future48 Workforce Accelerator to build a local battery talent ecosystem. - **Customer diversification**: Supplying multiple automakers (GM, Honda, Hyundai) and ESS customers, with a focus on securing additional “supply agreements” [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/3784/) ## Why Work Here - **High-growth environment**: From a startup-like team of ~62 employees to a projected 1,500+ in two years – rapid scaling offers significant career advancement and ownership opportunities. - **Cutting-edge technology**: Work on next-generation 46-Series cylindrical batteries and LFP ESS cells in a brand-new, state-of-the-art manufacturing complex. - **Training and development**: The company has established a dedicated workforce training center in partnership with local colleges, investing in skill-building for battery professionals [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/3784/) - **Location**: Queen Creek, Arizona – lower cost of living, sunny climate, and growing tech/manufacturing hub. - **Culture**: Emphasis on safety, quality, and sustainability – values include “collaboration, innovation, and respect” (as seen in job postings). On-site roles with shift-based production positions available. - **Policy**: Likely on-site/on-location given manufacturing nature; some corporate/engineering roles may offer hybrid flexibility. ## Sources 1. [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/2592/) – LG Energy Solution’s $5.5 Billion Stand-Alone Battery Manufacturing Complex Project in Arizona Well Underway (April 2024) 2. [news.lgensol.com](https://news.lgensol.com/company-news/press-releases/3784/) – LG Energy Solution Makes Notable Progress in Construction and Hiring in Arizona (April 2025) 3. [linkedin.com](https://www.linkedin.com/company/lg-energy-solution-az) – LG Energy Solution Arizona LinkedIn Company Page 4. [job-boards.greenhouse.io](http://job-boards.greenhouse.io/lgenergyaz) – Careers page with job listings and about us 5. [lgensol.com](https://www.lgensol.com/en/company/info-outline) – LG Energy Solution corporate overview ## Other roles at LG Energy Solution Arizona - [Sr. Engineer, Production](https://feeny.ai/job/sr-engineer-production-lg-energy-solution-arizona-queen-creek-e4dpsyptr7jy) — Queen Creek, AZ - [Manager, Environment & Sustainability](https://feeny.ai/job/manager-environment-sustainability-lg-energy-solution-arizona-queen-creek-fbcqpegmeq73) — Queen Creek, AZ - [Production Operator](https://feeny.ai/job/production-operator-lg-energy-solution-arizona-queen-creek-11b09h3sg2mx) — Queen Creek, AZ - [Specialist II, Culture & Engagement](https://feeny.ai/job/specialist-ii-culture-engagement-lg-energy-solution-arizona-queen-creek-edr0y20g0ryy) — Queen Creek, AZ - [Engineer I, Environment & Sustainability](https://feeny.ai/job/engineer-i-environment-sustainability-lg-energy-solution-arizona-queen-creek-dr9ag7m57yga) — Queen Creek, AZ - [Specialist I, Procurement (Construction)](https://feeny.ai/job/specialist-i-procurement-construction-lg-energy-solution-arizona-queen-creek-n63szxb7gxtw) — Queen Creek, AZ - [Sr. Engineer, Equipment](https://feeny.ai/job/sr-engineer-equipment-lg-energy-solution-arizona-queen-creek-e0e3pfrx6y72) — Queen Creek, AZ - [Technician II, Maintenace](https://feeny.ai/job/technician-ii-maintenace-lg-energy-solution-arizona-queen-creek-sjz3vwhfg173) — Queen Creek, AZ - [Specialist II, Procurement (Construction)](https://feeny.ai/job/specialist-ii-procurement-construction-lg-energy-solution-arizona-queen-creek-q9yn8ezeysa5) — Queen Creek, AZ - [Engineering Manager, Production](https://feeny.ai/job/engineering-manager-production-lg-energy-solution-arizona-queen-creek-6z18qb9hsaa2) — Queen Creek, AZ