--- title: 'Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction at World Wide Professional Solutions' canonical: 'https://feeny.ai/job/senior-project-manager-utility-electrical-vernon-tx-data-center-construction-kr50wwp0fkac' type: 'job' last_seen: '2026-10-14' --- # Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction at World Wide Professional Solutions - **Company:** World Wide Professional Solutions - **Location:** Vernon, TX - **Employment:** full-time - **Work type:** onsite - **Posted:** 2026-09-30 - **Last confirmed live:** 2026-10-14 - **Apply:** https://jobs.lever.co/wwprosolutions/780de441-c3a4-41ac-8dfe-395841ea2de1 ## Job description WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance. WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean construction, collaborative contracting, and execution approaches to enable breakthroughs in performance. WWPS is hiring a Senior Project Manager, Utility Electrical, to lead the utility electrical and high voltage substation scope for a large-scale data center project in Vernon, TX. This is a full time, 100% onsite role. This is a high visibility owner’s representative role focused on the Futility electrical package, including the high voltage utility interconnection, substation, protection and controls, energization, and interface to the data center electrical distribution system. You will own execution across design, construction, commissioning, and turnover. Wherever you are based, we provide full relocation or travel support including per diem, ensuring a smooth transition so you can hit the ground running from day one. What Makes This Role Different Owner’s representative leadership for the utility electrical and high voltage substation package Direct coordination across the serving utility, substation contractors, engineering teams, vendors, commissioning teams, and data center stakeholders Technical scope covering utility interconnection, transformers, breakers, switchyard equipment, protection and controls, metering, SCADA, grounding, and incoming power distribution Ownership of energization readiness, switching coordination, testing, commissioning, and turnover of mission critical power infrastructure A specialized role for a project leader who understands utility and substation construction, not only building level MEP electrical work ## What You Will Do Lead full lifecycle delivery of the utility electrical scope from design coordination and procurement through construction, energization, commissioning, and turnover Serve as the primary owner’s representative interface with the serving utility, electrical EPC or contractor, design engineers, equipment vendors, commissioning teams, and site leadership Manage high voltage substation and switchyard scope including transformers, breakers, disconnect switches, bus, instrument transformers, control buildings, station service, grounding systems, cable systems, and associated civil interfaces Drive utility interconnection milestones, design approvals, long lead equipment procurement, outage and switching coordination, and required energization dates Review and challenge electrical single line diagrams, substation layouts, equipment submittals, protection and control schemes, relay coordination, grounding studies, and construction packages Oversee protection and controls, relaying, SCADA, telecom, revenue or utility metering, and the interfaces between utility systems and the data center electrical distribution network Coordinate installation and testing of high voltage and medium voltage cables, terminations, transformers, switchgear, breakers, grounding, and related electrical infrastructure Lead quality and commissioning readiness including factory acceptance testing, field acceptance testing, relay testing, electrical testing, punch resolution, and energization documentation Develop and manage safe energization, switching, lockout tagout, outage, and turnover plans in alignment with utility requirements, NEC, NESC, NFPA 70E, OSHA, and project standards Control schedule, cost, risk, change management, contractor performance, and interface issues for the utility electrical workstream Identify constructability, sequencing, access, equipment delivery, and cross discipline interface risks early and drive them to resolution ## What You Bring 12 to 20+ years of construction project management experience with significant electrical infrastructure responsibility Strong experience delivering utility substations, high voltage electrical infrastructure, utility interconnections, transmission or distribution projects, or comparable mission critical power systems Hands on knowledge of substation construction, power transformers, high voltage and medium voltage switchgear, breakers, protection and controls, relays, grounding, cable systems, and energization Ability to read and manage execution from single line diagrams, electrical specifications, protection and control drawings, substation layouts, and commissioning procedures Proven ability to lead contractors, engineers, utilities, vendors, commissioning teams, and multidisciplinary project stakeholders Experience with electrical QA and QC, testing, commissioning, turnover, energization planning, and safe work practices around energized systems Proficiency with project controls and construction management tools such as Procore, Primavera P6, or MS Project ## Preferred Background Hyperscale data center or mission critical utility electrical experience strongly preferred Direct, high voltage substation, utility interconnect, switchyard, or owner’s representative electrical package experience is highly relevant Background with an electric utility, substation EPC, electrical contractor, engineering firm, commissioning provider, or large industrial power project is highly transferable Bachelor’s degree in electrical engineering, construction management, engineering, or a related field. PE, PMP, or electrical commissioning credentials are a plus ## Compensation and Benefits Highly competitive compensation aligned with senior level utility electrical and project leadership experience Per diem and travel support where applicable Medical, dental, and vision coverage Life insurance and disability coverage Company matched retirement plan Paid time off and paid holidays ## Why Top Candidates Choose WWPS Lead one of the most technically critical workstreams on a large-scale data center program Operate in a true owner’s representative capacity with direct influence on utility power delivery, energization, and project outcomes Work at the intersection of utility infrastructure, high voltage substations, mission critical electrical systems, and data center construction Join a project environment where electrical reliability, schedule certainty, and safe energization are central to success Be part of a company that is scaling and investing in specialized technical project leadership Bottom Line If you are a Senior Project Manager with deep utility electrical or substation experience who can lead a  power delivery package from design through energization and turnover, this role offers direct ownership of one of the most critical scopes on a major data center project in Vernon, Texas. This is a full-time position for World Wide Professional Solutions. We offer excellent benefits including medical, dental, vision, life, short term disability, long term disability, and a company match retirement plan. All benefits begin the first of the month following your start date. World Wide Professional Solutions provides equal employment opportunities to all employees and applicants for employment and prohibits discrimination and harassment of any type without regard to race, color, religion, age, sex, national origin, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state or local laws. ## About World Wide Professional Solutions ## Company Overview - **One-liner**: World Wide Professional Solutions (WWPS) is a high‑tech professional services firm that provides experienced management teams for semiconductor, mission‑critical, and energy industry projects. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Entity Type**: Private (acquired by Cumming Group in April 2025) [linkedin.com](https://linkedin.com/company/world-wide-professional-solutions) - **Headquarters**: New York, New York, United States [linkedin.com](https://linkedin.com/company/world-wide-professional-solutions) - **Founded**: 2016 [linkedin.com](https://linkedin.com/company/world-wide-professional-solutions) - **Founders**: Not publicly disclosed; key leadership includes President Joel Tomlin and VP of Operations Jim Boucher [wwprosolutions.com](https://www.wwprosolutions.com/about-us) ## Core Business - **Primary industries**: Semiconductor manufacturing, data centers (mission‑critical), and energy infrastructure. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Target customers**: Large‑scale capital project owners in high‑tech sectors (B2B, Enterprise). [wwprosolutions.com](https://www.wwprosolutions.com/) - **Mission / purpose**: “Unleash collective talent to create breakthroughs in project delivery with positive interactions, seamless collaboration and innovative ideas.” [wwprosolutions.com](https://www.wwprosolutions.com/about-us) ## Products & Services - **Program Management**: End‑to‑end oversight of complex, multi‑phase capital programs. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Construction Management**: On‑site construction execution and coordination. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Project Management**: Detailed planning, scheduling, and delivery of individual projects. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Design Management**: Integration of design intent with construction reality. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Business Intelligence & Software Integration**: Data‑driven project analytics and systems integration. [wwprosolutions.com](https://www.wwprosolutions.com/) ## Market Standing - **Valuation / Market Cap**: Not publicly available (private company). - **Key Metric**: 149 employees (as of mid‑2025) with 27.5% YoY headcount growth; 37 active job postings (up 270% YoY). [linkedin.com](https://linkedin.com/company/world-wide-professional-solutions) - **Notable Investors / Partners**: Cumming Group (parent company, 60+ offices globally, 2,500+ team members). [wwprosolutions.com](https://www.wwprosolutions.com/about-us) - **Growth Signals**: - Merged with Cumming Group in April 2025, expanding geographic reach and resources. [linkedin.com](https://linkedin.com/company/world-wide-professional-solutions) - Expanding into bio‑pharma construction (e.g., Houston roles) and new data‑center markets (Vernon, TX; La Porte, IN). [jobs.lever.co](https://jobs.lever.co/wwprosolutions) - Strong talent pipeline from Intel, AM Technical Solutions, and DPS Group. [linkedin.com](https://linkedin.com/company/world-wide-professional-solutions) ## Competitive Advantages - **Deep domain expertise**: Leadership team averages 25+ years of experience in semiconductor, mission‑critical, and energy sectors. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Lean construction & collaborative contracting**: Proprietary methodologies that reduce waste and improve project performance. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Backing of Cumming Group**: Access to a global network of 2,500+ professionals and established client relationships. [wwprosolutions.com](https://www.wwprosolutions.com/about-us) ## Strategic Focus - **Current priorities**: Scaling project delivery capacity for semiconductor mega‑fabs, hyperscale data centers, and energy infrastructure. [wwprosolutions.com](https://www.wwprosolutions.com/) - **Direction**: Deepen presence in high‑growth construction verticals (bio‑pharma, advanced manufacturing) while strengthening business intelligence capabilities. [jobs.lever.co](https://jobs.lever.co/wwprosolutions) ## Why Work Here - **Culture**: Emphasis on collaboration and innovation; described as a place where “driven employees can call WWPS home.” [wwprosolutions.com](https://www.wwprosolutions.com/about-us) - **Work‑style**: Mix of on‑site (Chandler, AZ; Hillsboro, OR) and hybrid roles (Phoenix, AZ); many positions require field presence. [jobs.lever.co](https://jobs.lever.co/wwprosolutions) - **Compensation & reviews**: Employer rating 3.5/5 (18 reviews); compensation rated 3.6/5, work‑life balance 3.3/5. [linkedin.com](https://linkedin.com/company/world-wide-professional-solutions) - **Growth opportunity**: Rapid headcount expansion (+27.5% YoY) and 270% increase in job postings signal strong hiring momentum. [linkedin.com](https://linkedin.com/company/world-wide-professional-solutions) ## Sources 1. [wwprosolutions.com – Homepage](https://www.wwprosolutions.com/) 2. [wwprosolutions.com – About Us](https://www.wwprosolutions.com/about-us) 3. [jobs.lever.co – Careers Page](https://jobs.lever.co/wwprosolutions) 4. [linkedin.com – Company Profile](https://linkedin.com/company/world-wide-professional-solutions) ## Other roles at World Wide Professional Solutions - [SIPP Coordinator, Manassas, VA - Semiconductor](https://feeny.ai/job/sipp-coordinator-manassas-va-semiconductor-world-wide-professional-solutions-sna0mdqh6xvc) — Manassas, VA - [Senior Executive Assistant, Construction Operations, Vernon, TX - Data Center](https://feeny.ai/job/senior-executive-assistant-construction-operations-vernon-tx-data-center-world-m765ft3s9dtd) — Stamford, TX - [Project Administrative Coordinator, Construction, Vernon, TX - Data Center](https://feeny.ai/job/project-administrative-coordinator-construction-vernon-tx-data-center-world-e8mmrap7n22q) — Stamford, TX - [Tool Install Design Manager, Peoria, AZ - Semiconductor](https://feeny.ai/job/tool-install-design-manager-peoria-az-semiconductor-world-wide-professional-t6tgfqsyw1zm) — Peoria, AZ - [Project Controls Coordinator - Chandler, AZ - Semiconductor](https://feeny.ai/job/project-controls-coordinator-chandler-az-semiconductor-world-wide-professional-9zzaw1gejd2m) — Chandler, AZ - [Senior Project Manager, Instrumentation & Controls - Semiconductor](https://feeny.ai/job/senior-project-manager-instrumentation-controls-semiconductor-world-wide-xezacb5cjy7y) — Peoria, AZ - [Lead Project Schedulers - Semiconductor](https://feeny.ai/job/lead-project-schedulers-semiconductor-world-wide-professional-solutions-chandler-rq211h84tzsp) — Chandler, AZ - [Quantity Surveyor, Malta, NY - Semiconductor](https://feeny.ai/job/quantity-surveyor-malta-ny-semiconductor-world-wide-professional-solutions-malta-5zsqf5ka6ae4) — Malta, NY - [CSA (Cleanroom) Construction Area Superintendent](https://feeny.ai/job/csa-cleanroom-construction-area-superintendent-world-wide-professional-asewyfbx1s0v) — Chandler, AZ - [Electrical Project Manager Basebuild - Semiconductor - Chandler, AZ](https://feeny.ai/job/electrical-project-manager-basebuild-semiconductor-chandler-az-world-wide-ynd4rspja5vp) — Chandler, AZ