Formenergy website
Formenergy

Formenergy

Multi-day iron-air battery storage for the electric grid, made in America.

Careers(118)
Formenergy website preview

Overview: The company betting that rust can save the grid

Form Energy is chasing a problem most battery companies dodge: what happens when the wind stops and the sun goes down for days, not hours. Its answer is an iron-air battery that stores electricity for up to 100 hours at a fraction of the cost of lithium-ion, built from three of the cheapest materials on Earth, iron, water, and air.

Five energy storage veterans founded the company in 2017 out of MIT's The Engine, and the bet has drawn real money. Form has raised more than $1.2 billion, employs close to 1,000 people, and is now running trial production at Form Factory 1, a 550,000 square foot plant built on the bones of the old Weirton Steel mill in West Virginia. The next chapter is the hard one: turning signed utility contracts into batteries shipped at scale.

What They Do: A 100-hour battery for the days renewables go quiet

Form makes grid-scale energy storage that lasts multiple days, not the four hours a typical lithium-ion system delivers. Its iron-air battery works on reversible rusting: it takes in oxygen to discharge and releases it to recharge, which is slow but dirt cheap, exactly the trade a utility wants when it needs to firm up renewables through a long cold snap.

The pitch to grid operators is that this fills the gap between short-duration lithium and seasonal storage, the missing piece for running a clean grid around the clock. Form also sells Formware, software that lets utilities model what multi-day storage is actually worth inside their own portfolios.

Problems: What breaks when the grid runs on wind and sun

A grid leaning on renewables has a timing problem. Solar and wind are cheap but intermittent, and lithium-ion batteries tap out after a few hours, so utilities still lean on gas peaker plants to cover the long gaps. Form's technology is aimed squarely at those multi-day stretches of low renewable output, the stress periods where reliability and affordability usually collide.

The pitch is that 100-hour storage lets a utility ride through those windows without firing up fossil backup, and increasingly without building new generation at all for the AI data centers now straining the grid.

How it Happens

Multi-day gaps in renewable output that short-duration lithium-ion batteries can't cover
Reliance on gas peaker plants for grid reliability
Firm, round-the-clock power for AI data centers and high-demand loads
Affordable grid reliability as demand rises and the grid decarbonizes

Who It's For: Built for utilities and the data centers now crowding the grid

Form's customers are electric utilities, grid operators, and large energy developers, the buyers who plan capacity in gigawatt-hours and decades. These are long, regulated sales cycles, often gated on public utility commission approval, which is why so many of Form's deals are announced as pilots first.

The newer buyer is the AI data center. The Crusoe agreement and the Google project served through Xcel both point at the same shift: hyperscale computing needs firm, round-the-clock power, and it is willing to sign long-term supply deals to lock it in.

Ideal Customer Profiles

Utility resource planners
  • Meeting rising demand reliably and affordably
  • Reducing reliance on fossil peaker plants
Data center operators
  • Securing firm, 24/7 power at scale
  • Locking in long-term energy supply

Products: One battery, one modeling tool, one very big factory

Form's whole business rests on a single hero product: the iron-air battery system, a 100-hour, grid-scale cell that traded lithium's speed for radically lower cost and safety. It passed UL9540A safety testing with no flame or thermal runaway, a real selling point in an industry haunted by battery fires.

Around it sits Formware, the software Form gives utilities to value multi-day storage in their portfolios, and Form Factory 1, the West Virginia plant now producing the batteries at volume.

Iron-Air Battery System
A grid-scale battery that stores energy for up to 100 hours using low-cost, abundant iron, water, and air. Passed UL9540A safety testing with no thermal runaway.
Formware
Software for utilities and grid operators to model the value of multi-day energy storage in their portfolios.

Business Model: Sell hardware by the gigawatt-hour, on long utility contracts

Form makes money the way an industrial manufacturer does: it builds iron-air battery systems and sells them to utilities and developers under multi-year supply and project agreements, measured in megawatts of power and gigawatt-hours of energy. Pricing is negotiated per deal, not published, and the contracts often begin as regulator-approved pilots that scale into larger commitments. The Crusoe deal, for instance, locks in secured volumes, pricing, and delivery terms beginning in 2027.

Pricing

custom / contract

Competition: Racing lithium-ion on cost, and other long-duration bets on physics

Form's real competition is twofold. The incumbent is lithium-ion, which is cheap, proven, and fast to deploy but runs out after a few hours, so Form has to win on cost-per-hour of duration rather than raw performance. The other front is the crowded field of long-duration storage startups chasing the same multi-day gap with different chemistries.

Form's edge is that iron-air uses abundant materials with a domestic supply chain and a factory already running, which is a harder thing to copy than a lab result.

Competes with

Lithium-ion battery storageEos Energy EnterprisesESS Inc.Other long-duration storage developers

Their edge

Cost per hour of duration
Iron-air is built from cheap, abundant materials, targeting multi-day storage at a fraction of lithium-ion's cost.
A factory, not a lab result
Form Factory 1 is already producing at commercial scale, a harder moat to replicate than a prototype.
Inherent safety
No thermal runaway and UL9540A certification, a real advantage in an industry wary of battery fires.

Where they're betting

  • Ramping manufacturing at Form Factory 1
  • Powering AI data centers with long-duration storage
  • International expansion (Ireland and beyond)

Proof: From lab cells to the largest storage project ever announced

Form has spent years de-risking the technology in public. It has tested tens of thousands of sub-scale cells and hundreds of full-scale ones, deployed grid-connected systems in California, and stood up its first commercial-scale factory. The headline validation came when the U.S. Department of Energy selected Form for an 85 MW / 8,500 MWh project in Maine, the largest energy storage project by energy capacity announced globally at the time.

Over $1.2B raised across six rounds
Commercial pipeline exceeding 750 MW / 75 GWh under agreement
85
MW / 8,500 MWh DOE-selected project in Maine (largest storage project by energy capacity announced globally at the time)
12
GWh iron-air supply agreement with Crusoe for AI data centers
300
MW / 30 GWh project with Xcel Energy to power a Google data center in Minnesota
First international project: 1 GWh deployment in Ireland

What People Say: A mission people love, at a pace that wears some down

Employees consistently praise the mission and the people: a motivated, technically strong team, minimal bureaucracy, and easy access to leadership. Reviewers describe it as one of the better cultures they've worked in, with real room to grow.

The recurring complaint is the flip side of a hardware startup scaling fast: long hours, shifting scope, and teams struggling to keep up as roles and priorities change week to week. A few reviews call out heavy middle management and communication gaps. It reads as a place for the mission-driven who can handle constant change, less so for those who want stability.

Well-regarded for its mission and people; the recurring knock is the strain of a fast-scaling hardware startup, long hours and constant change.

Loved
  • Strong mission and sense of purpose
  • Talented, motivated, friendly team
  • Minimal bureaucracy and accessible leadership
  • Interesting technical problems and growth potential
Gripes
  • Long hours and demanding pace
  • Constant change and shifting scope as the company scales fast
  • Communication gaps and heavy middle management

Funding: More than $1.2B raised, and a factory to fill with it

Form has pulled in over $1.2 billion across six rounds, an unusually deep war chest for a hardware company, because building factories costs real money. The $405 million Series F in October 2024 was led by T. Rowe Price, with GE Vernova joining as a new backer.

The cap table reads like a who's who of climate capital: Breakthrough Energy Ventures, TPG Rise Climate, Coatue, ArcelorMittal's XCarb fund, Eni Next, Temasek, GIC, and MIT's The Engine among them. On top of the equity, the DOE committed $150 million toward the West Virginia factory.

Total raised

$1.2B+

Valuation

$3.4B

Latest round

Series F · $405M · 2024

Backers

T. Rowe PriceGE VernovaBreakthrough Energy VenturesTPG Rise ClimateCoatueArcelorMittal (XCarb)Eni NextPrelude VenturesThe EngineEnergy Impact PartnersCapricorn Investment GroupNGPTemasekGIC

Outlook: The bet is proven, now it has to be built

Form has done the hard science and won the marquee contracts. The open question is execution: turning a de-risked chemistry and a full order book into batteries delivered on time, at cost, from a factory still ramping. The AI data center boom has handed it a demand tailwind few clean-energy hardware companies enjoy, but hardware at gigawatt-hour scale is unforgiving, and the company's own reviews hint at the strain of moving this fast. If Weirton hits its stride, Form becomes the reference case for long-duration storage. If it stumbles on the manufacturing curve, the technology lead won't matter.

Team & Culture: Gritty pragmatists reviving a Rust Belt steel town

Form runs on three stated values, humanity, excellence, and creativity, and describes its people as gritty pragmatists and clear-eyed optimists. The clearest expression of the culture is geographic: it chose to build its first factory on the site of the shuttered Weirton Steel mill, hiring hundreds in a town that lost its industrial anchor.

The team spans R&D scientists in Somerville, battery engineers in Berkeley, and manufacturing crews in Weirton, with some remote roles. Benefits are notably strong for a startup: 100% of medical, dental, and vision premiums covered from day one, stock options for every employee, and up to 20 weeks of paid leave for birthing parents.

Values
Humanity, Excellence, Creativity, Gritty pragmatism and clear-eyed optimism, Mission-driven, fast-paced
Work policy
On-site at facilities in Weirton, WV, Berkeley, CA, and Somerville, MA; some hybrid and remote roles.
Hiring
Hiring aggressively across manufacturing, controls, and battery engineering, plus software, IT, and operations, concentrated in Weirton, WV, with roles in Berkeley, CA and Somerville, MA.
Manufacturing & Test
SolidWorks, CAD, PLM, MES, PFMEA, DFMEA, PPAP, GD&T, Control Plans, LabVIEW, Injection molding
Controls & Robotics
PLC, SCADA, Ignition, Robotics & vision systems, ROS, Modbus, CAN, I2C, Firmware
Simulation & Analysis
CFD, FEA, JMP, Minitab, Python, Data analysis
Software & Embedded
Python, C++, C#, Go, Firmware, Embedded software, Cloud services
IT & Security
Microsoft 365, Azure, ITIL / ITSM

Manufacturing & Engineering culture at Formenergy

  • Fast-paced hardware and manufacturing environment ramping to high volume
  • Whole-system mindset across firmware, controls, and mechanical
  • Roles concentrated at Form Factory 1 in Weirton, WV, some on night shifts

Software culture at Formenergy

  • Software org owns the full stack up and down the battery: firmware, embedded, power controls, cloud services, and data systems
  • Coordinates tightly with hardware NPI schedules and field operations

Benefits & perks

Your Health
  • 100% of medical, dental, and vision premiums covered for employees
  • 80% of medical, dental, and vision premiums covered for dependents
  • Health insurance coverage begins first day of employment
  • Access to a Health Savings Account
  • Access to mental health counseling services
  • Generous vacation policies to recharge
Your Family
  • Up to 12 weeks of paid parental leave (up to 20 weeks for birthing parents)
  • Access to a Health Flexible Spending Account
  • Access to a Dependent Care Account
  • Access to an Adoption Assistance Flexible Spending Account
Your Future
  • Competitive compensation
  • Stock options granted to all employees
  • Company-sponsored 401(k)
  • Annual budget for professional development
  • Employee Resource Program (financial resources, legal guidance, consulting services)
  • 100% employer-sponsored life insurance, short and long-term disability

Compensation: Six-figure engineering bands, equity for everyone

Disclosed pay skews to the manufacturing and hardware roles that dominate Form's hiring. Engineering salaries run from the low six figures into the low $200Ks, with senior operations and leadership roles reaching higher, and a handful of technician and shift roles posted hourly. Ranges are US dollars and vary by location, from the Bay Area to Weirton.

The bigger draw is the whole package: Form grants stock options to every employee, which for a company this early can matter more than base salary.

Engineering
$111,826$223,455 · yearly
based on many disclosed roles
Operations
$199,950$293,835 · yearly
based on a few disclosed roles
Other
$97,221$293,835 · yearly
based on many disclosed roles

Stock options are granted to all employees, a meaningful part of total comp at this stage.

In the News: Data center deals and a first move overseas

Form's recent press tracks two storylines: the AI power crunch and the company's first steps abroad. The Crusoe agreement for 12 GWh of batteries to power AI data centers drew coverage from Bloomberg and TechCrunch, while the Google data center project in Minnesota, served through Xcel, made headlines for pairing a hyperscaler with the world's largest battery. Form also announced its first international project, a 1 GWh iron-air deployment in Ireland.

More in Energy

Other companies hiring in the same space.

Backed by Coatue

Companies that share an investor.

OpenAI

OpenAI (710 jobs)

710 jobs

Builds frontier AI models and ships them as consumer, developer, and enterprise products — ChatGPT, the API platform, and Codex.

Harvey

Harvey (331 jobs)

331 jobs

Domain-specific AI for legal and professional services that automates research, drafting, contract analysis, and due diligence.

Checkout.com

Checkout.com (175 jobs)

175 jobs

Global enterprise payments platform that helps large merchants accept, move, protect, and optimize money through one API.

Notion

Notion (148 jobs)

148 jobs

Notion is an all-in-one AI workspace that combines docs, wikis, databases, and project management into a single customizable platform, now built around AI agents that answer questions and automate recurring work.

Alan

Alan (94 jobs)

94 jobs

A French digital health partner that combines health insurance, a virtual clinic, and prevention into a single app for companies, the self-employed, and retirees.

Airwallex

Airwallex (594 jobs)

594 jobs

Airwallex is a global financial platform that lets businesses open multi-currency accounts, move money across borders, issue cards, and embed financial services through its own proprietary infrastructure.

Crusoe

Crusoe (363 jobs)

363 jobs

Energy-first AI infrastructure company that sources power, builds hyperscale AI data centers, and runs a GPU cloud purpose-built for AI workloads.

Hadrian Automation

Hadrian Automation (131 jobs)

131 jobs

Hadrian builds AI-powered autonomous factories to manufacture precision components for the aerospace and defense industries, aiming to reindustrialize American manufacturing.